15 May 2003 UTC
- 00:00 MDT - 06:00 UTC - NCEMO data acquisition halted
- Data acquisition at NCEMO has been terminated because of a planned move of the residence surrounding the observatory. This termination shall continue until a suitable, new location can be found.
- Data archives, construction details, and other related materials shall remain available during this period.
JAD
1 April 2003 UTC
- 22:21 UTC - entered the magnetometer enclosure
- Restored lock by adjusting detector and reseting integrator
JAD
24 March 2003 UTC
- 00:00 UTC - entered the magnetometer enclosure
- Restored lock by adjusting nulling magnets and reseting integrator
JAD
19 March 2003 UTC
- 03:00 UTC - Main AC power bounce causes control loop "goes out of lock"
JAD
27 January 2003 UTC
- 00:00 UTC - Updated web site
- Now using SSI (Server Side Includes) to include boilerplate common to every page.
- Now using more CSS (Cascading Style Sheets) to make navigation bar and links more clearly identified.
- Changed "Most Recent Data" display to show all three current hourly graphs.
JAD
01 November 2002 UTC
-
20:00 UTC - The global data filter algorithm has been modified. The gory details follow:
- Each recorded analog signal is hardware filtered before digitization with a single-pole, 1Hz, low pass anti-aliasing filter.
- Each digitized data stream (corresponding to one analog signal) is subjected to stored calibration data to convert the raw voltages to meaningful measurements.
- Archived text data is not subjected to digital filtering and is stored exactly as recorded with the calibrations applied.
- Plotted data is subjected to additional digital filtering with a rectangular window-based filter.
- A different filter window is used for graphs with different time axes.
- The plotted data filter window was previously set to 1, 6, and 24 seconds for the 1, 6, and 24 hour graphs, respectively.
- With this change, the plotted data filter window is now set to 6, 36, and 144 seconds for the 1, 6, and 24 hour graphs, respectively.
- Previously and currently and in all graphs exactly 600 time points are plotted.
- The plotted data was previously under-filtered by a factor of 6 in time.
- With this change, the plotted data is now optimally filtered - consistent with the number of plotted data points.
- With this change, there is no change in the time resolution of the plotted data.
- With this change, there is a roughly two-fold increase in the signal-to-noise ratio.
JAD
10 August 2002 UTC
- 16:45 UTC - Repaired broken wires to external temperature sensor
JAD
9 July 2002 UTC
- 15:10 UTC - Entered the magnetometer enclosure
- Reset loop to restore lock
JAD
4 July 2002 UTC
- 22:00 UTC - Entered the magnetometer enclosure
- Repositioned detector to reset EW field
JAD
2 June 2002 UTC
- 20:30 UTC - Restored power
- Entered the magnetometer enclosure
- Repositioned detector to reset EW field
- 17:50 UTC - Turned off power to magnetometer for unrelated periodic maintanence
JAD
20 May 2002 UTC
- 21:10 UTC - entered the magnetometer enclosure
- Repositioned nulling magnet to reset EW field
JAD
20 May 2002 UTC
- 11:06 UTC - control loop "goes out of lock" as evidenced by loss of laser signal and pinning of magnetometer signal to rail
JAD
30 July 2001 UTC
- 09:10 UTC - Entered the magnetometer enclosure, centered Field Signal by repositioning Nulling Magnet Assembly, and closed magnetometer enclosure
- 09:20 UTC - Repositioned external temperature sensor to reduce periodic interference by local sprinklers
JAD
8 June 2001 UTC
- 08:50 UTC - Entered the magnetometer enclosure, centered Field Signal by repositioning Nulling Magnet Assembly, and closed magnetometer enclosure
JAD
6 May 2001 UTC
- 22:30 UTC - Entered enclosure for examination only and closed immediately
JAD
29 April 2001 UTC
- 23:50 UTC - Repaired wires leading to external temperature sensor having been gnawed apart
JAD
3 April 2001 UTC
- 01:00 UTC - Entered the magnetometer enclosure, reset integrator, and closed magnetometer enclosure
JAD
2 April 2001 UTC
- 21:30 UTC - Lost lock due to unusually large activity
JAD
22 March 2001 UTC
- 00:30 UTC - Entered the magnetometer enclosure, reset integrator, and closed magnetometer enclosure
JAD
20 March 2001 UTC
- 14:15 UTC - Lost lock due to unusually large activity
JAD
30 January 2001 UTC
- 22:20 UTC - Adjusted Drive Coil gain magnitude to correct a long-standing computational error (Thanks to Prof. Gerard T. Blanchard)
- Updated processing program to improve y-axis labels
JAD
23 January 2001 UTC
- Updated processing and listing programs to reflect a change from GIF graph files to PNG graph files
- Old GIF files are still displayed, newly created files are in PNG format
JAD
18 September 2000 UTC
- 21:00 UTC - entered the magnetometer enclosure
- Replaced TBM with new version containing corrected (EW) Drive Coils and Adjustable Damping
- Replaced Detector with new version featuring a linear deflection response
- Adjusted nulling magnet to reset EW field, insured that NS field was nulled as evidenced by lengthening of TBM period
- Adjusted damping to approximately critical damping
- Increased Loop Gain to maximum without inducing loop oscillation
- 22:00 UTC - closed the magnetometer enclosure
JAD
15 September 2000 UTC
- 18:25 UTC - entered the magnetometer enclosure
- Repositioned detector to trim EW field and recenter Field data
- Touched up Loop Gain to maintain loop on edge of oscillation
- 18:35 UTC - closed the magnetometer enclosure
JAD
14 September 2000 UTC
- 21:35 UTC - entered the magnetometer enclosure
- Found that the control loop had "gone out of lock"
- Repositioned nulling magnet to reset EW field, insured that NS field was nulled as evidenced by lengthening of TBM period
- Removed tape mask from detector face to permit evaluation of its effect on the Laser signal
- 22:05 UTC - closed the magnetometer enclosure
JAD
11 September 2000 UTC
- 03:30 UTC - recording was disabled for recabling the serial interconnect between the magnetometer enclosure and the workshop computer
- 05:55 UTC - recording restored
JAD
10 September 2000 UTC
- 18:00+ UTC - groundskeeping work (read: mowing the lawn)
JAD
3 September 2000 UTC
- 15:15 UTC - main power was turned off to the enclosure and logging computer for reasons unrelated to the magnetometer
- 15:28 UTC - main power was restored
JAD
23 August 2000 UTC
- 15:15 UTC - entered the magnetometer enclosure
- Inserted voltage divider (x0.5) on Field Signal in front of ADC to eliminate recently observed clipping of Field Signal
- Repositioned nulling magnet to (1) decrease restoring field and (2) recenter zero point
- Adjusted loop gain to account for change in restoring field
- 15:33 UTC - closed the magnetometer enclosure
- 15:40 UTC - adjusted logging program calibration constant to account for voltage divider and restarted logging program
JAD
20 August 2000 UTC
- 18:24 UTC - Creation of log and initial entry.
JAD
Home |
Graph Data |
Text Data |
Layout |
Detector |
Laser |
Coil |
Electronics |
Enclosure |
Acquisition
Linearity Analysis |
Harmonic Analysis |
References |
Operator Log
Copyright © 2001, 2002, 2003 XTR Systems, LLC
All Rights Reserved
Send comments to: Webmaster